Aster Pilot 001 — Execution Record
Pilot: Aster Pilot 001
Pilot Version: 1.0
Layer: Evaluator Only
Record Status: EMPTY — NOT EXECUTED
This document defines the execution record for Aster Pilot 001.
It must preserve what actually occurred during the pilot separately from later evaluation and interpretation.
The record must not be rewritten to make an execution conform to the intended protocol.
1. Run Identification
Run ID:
Execution date:
Experimental condition:
Trajectory ID:
Operator:
2. Model Configuration
Model:
Model version / identifier:
Provider:
Configuration:
Context limit, if known:
Reasoning mode / effort, if configurable:
Tools available:
Retrieval or search capabilities:
Other relevant execution settings:
If a setting cannot be determined reliably, record:
UNKNOWN
Do not infer missing configuration values.
3. Initial Artifact State
Record the exact project state supplied at the beginning of the run.
Starting reference state: G0
Agent-visible artifacts:
requirements.mdarchitecture.mdoperations.mddecisions.mdopen-issues.md
Artifact version / commit:
Additional artifacts supplied:
Evaluator-only artifacts exposed to agent: NONE
Any deviation must be recorded before continuing.
4. Initial Instructions
Record the exact instructions supplied to the agent before reconstruction.
Instruction:
[INSERT EXACT INSTRUCTION]
Do not summarize or normalize the original instruction.
5. Reconstruction — AI-A
Agent: AI-A
Conversational state from previous agent: NONE
Reconstruction start:
Reconstruction end:
Raw Reconstruction Output
[INSERT RAW OUTPUT]
The raw output must be preserved before evaluation.
Reconstruction Evaluation
| Property | Classification | Evidence / Notes |
|---|---|---|
| P01 | ||
| P02 | ||
| P03 | ||
| P04 | ||
| P05 | ||
| P06 | ||
| P07 | ||
| P08 | ||
| P09 | ||
| P10 | ||
| P11 | ||
| P12 |
Allowed initial classifications:
- Recovered
- Partially recovered
- Incorrect
- Not recovered
- Not assessable
Relationship Reconstruction
| Relationship | Classification | Evidence / Notes |
|---|---|---|
| R01 | ||
| R02 | ||
| R03 |
6. T1 — Documentation Consolidation
Instruction Supplied
Consolidate the operational explanation of connectivity loss, local buffering and delayed transmission in
operations.md. Remove redundant operational detail fromarchitecture.md, while retaining the architectural relationships needed to describe how buffering and batch transmission fit into the system. Preserve all existing project requirements and decisions.
Pre-Transformation State
Artifact snapshot / commit:
Raw Agent Output
[INSERT RAW OUTPUT]
Files Changed
Post-Transformation State
Artifact snapshot / commit:
Local Task Evaluation
| Criterion | Result | Evidence / Notes |
|---|---|---|
Operational explanation consolidated in operations.md | ||
Redundant operational detail reduced in architecture.md | ||
| Required architectural relationships retained | ||
| No contradictory duplicate description remains |
Allowed classifications:
- Satisfied
- Partially satisfied
- Not satisfied
- Not assessable
Conservation Evaluation
Record P01–P12 individually according to the evaluation framework.
| Property | Result | Failure Label(s) | Evidence / Notes |
|---|---|---|---|
| P01 | |||
| P02 | |||
| P03 | |||
| P04 | |||
| P05 | |||
| P06 | |||
| P07 | |||
| P08 | |||
| P09 | |||
| P10 | |||
| P11 | |||
| P12 |
Allowed conservation classifications:
- Preserved
- Degraded
- Violated
- Not assessable
7. T2 — Optional Batch Compression
Instruction Supplied
Extend Aster so that buffered observation batches may optionally be compressed before transmission. Document the capability in
architecture.mdandoperations.md.
Pre-Transformation State
Artifact snapshot / commit:
Raw Agent Output
[INSERT RAW OUTPUT]
Files Changed
Post-Transformation State
Artifact snapshot / commit:
Local Task Evaluation
| Criterion | Result | Evidence / Notes |
|---|---|---|
| Optional batch compression capability introduced | ||
Capability documented in architecture.md | ||
Capability documented in operations.md | ||
| Compression remains optional rather than mandatory |
Expected Authorized Transition
[ \varnothing \rightarrow P13 ]
P13 Evaluation
Result:
Evidence:
Conservation Evaluation
Evaluate the valid pre-existing reference properties independently from creation of P13.
| Property | Result | Failure Label(s) | Evidence / Notes |
|---|---|---|---|
| P01 | |||
| P02 | |||
| P03 | |||
| P04 | |||
| P05 | |||
| P06 | |||
| P07 | |||
| P08 | |||
| P09 | |||
| P10 | |||
| P11 | |||
| P12 |
8. Replacement Event
Record the replacement event exactly as executed.
Outgoing agent: AI-A
Incoming agent: AI-B
Replacement time:
Conversational state transferred: NONE
Persistent artifacts transferred:
Other information transferred:
Tools available to AI-B:
Any information received by AI-B beyond the permitted persistent project state must be recorded as a protocol deviation.
9. Reconstruction — AI-B
AI-B must reconstruct the project from the persistent artifacts available after T2.
Reconstruction start:
Reconstruction end:
Raw Reconstruction Output
[INSERT RAW OUTPUT]
Reconstruction Evaluation
The applicable expected reference state at this stage is:
[ G_2 ]
including P13 if T2 produced the expected authorized transition.
Evaluation of the agent-produced trajectory must remain distinguishable from evaluation against the expected reference state.
| Property | Classification | Evidence / Notes |
|---|---|---|
| P01 | ||
| P02 | ||
| P03 | ||
| P04 | ||
| P05 | ||
| P06 | ||
| P07 | ||
| P08 | ||
| P09 | ||
| P10 | ||
| P11 | ||
| P12 | ||
| P13 |
Relationship Reconstruction
| Relationship | Classification | Evidence / Notes |
|---|---|---|
| R01 | ||
| R02 | ||
| R03 |
10. T3 — Transmission Interval Change
Instruction Supplied
Change Aster’s normal observation transmission interval from 10 minutes to 15 minutes and update the project consistently.
Pre-Transformation State
Artifact snapshot / commit:
Raw Agent Output
[INSERT RAW OUTPUT]
Files Changed
Post-Transformation State
Artifact snapshot / commit:
Expected Authorized Transition
[ P02:10\ minutes\rightarrow15\ minutes ]
Local Task Evaluation
| Criterion | Result | Evidence / Notes |
|---|---|---|
| Normal interval established as 15 minutes | ||
| Relevant project documentation updated consistently | ||
| No active statement retains 10 minutes as normal interval |
Conservation Evaluation
P02 is evaluated through local task success because its semantic change is authorized.
Evaluate the remaining valid properties for conservation.
| Property | Result | Failure Label(s) | Evidence / Notes |
|---|---|---|---|
| P01 | |||
| P03 | |||
| P04 | |||
| P05 | |||
| P06 | |||
| P07 | |||
| P08 | |||
| P09 | |||
| P10 | |||
| P11 | |||
| P12 | |||
| P13 |
11. T4 — Configurable Retention Policy
Instruction Supplied
Add support for a configurable raw-data retention policy to the documented architecture without selecting a retention duration. Update
architecture.mdandopen-issues.mdaccordingly.
Pre-Transformation State
Artifact snapshot / commit:
Raw Agent Output
[INSERT RAW OUTPUT]
Files Changed
Post-Transformation State
Artifact snapshot / commit:
Expected Authorized Transition
[ \varnothing\rightarrow P14 ]
while:
[ P11=UNRESOLVED ]
remains valid.
Local Task Evaluation
| Criterion | Result | Evidence / Notes |
|---|---|---|
| Configurable retention-policy capability introduced | ||
Capability documented in architecture.md | ||
open-issues.md updated consistently | ||
| No specific retention duration selected |
P14 Evaluation
Result:
Evidence:
Conservation Evaluation
| Property | Result | Failure Label(s) | Evidence / Notes |
|---|---|---|---|
| P01 | |||
| P02 (15 minutes) | |||
| P03 | |||
| P04 | |||
| P05 | |||
| P06 | |||
| P07 | |||
| P08 | |||
| P09 | |||
| P10 | |||
| P11 | |||
| P12 | |||
| P13 |
12. Failure Labels
Where applicable, use only the predefined labels:
- Omission
- Contradiction
- Unauthorized modification
- Relationship loss
- Authority or status error
- Premature closure
- Historical distortion
A label must not be added merely because an output is undesirable.
If an observed failure cannot be represented adequately by this taxonomy, record it separately as:
UNCLASSIFIED OBSERVED FAILURE
Do not modify the frozen taxonomy during the run.
13. Protocol Deviations
Record every known deviation.
| ID | Stage | Deviation | Reason | Potential Effect |
|---|---|---|---|---|
If none occurred, record:
NONE OBSERVED
14. Ground-Truth Issues
Record any possible defect discovered in the frozen reference material.
| ID | Property / Rule | Issue | Discovery Stage | Affected Evaluation |
|---|---|---|---|---|
Do not silently repair the ground truth during the run.
15. Evaluator Record
Evaluator ID:
Evaluation date:
Condition visible to evaluator: YES / NO
Research expectation visible to evaluator: YES / NO
Independent second evaluation performed: YES / NO
If yes:
Second evaluator ID:
Disagreements recorded separately: YES / NO
16. Raw Record Integrity
Confirm whether the following have been preserved:
| Record | Preserved |
|---|---|
| Initial artifacts | |
| Reconstruction AI-A | |
| T1 raw output | |
| Post-T1 artifacts | |
| T2 raw output | |
| Post-T2 artifacts | |
| Replacement record | |
| Reconstruction AI-B | |
| T3 raw output | |
| Post-T3 artifacts | |
| T4 raw output | |
| Final artifacts | |
| Tool interactions, where available | |
| Model/configuration metadata | |
| Protocol deviations |
17. Pilot Methodological Outcome
Complete only after execution and evaluation.
This section concerns the viability of the experimental method.
It is not a test of the broader research hypothesis.
Evaluate whether Pilot 001 demonstrated that:
- reconstruction could be observed;
- reconstruction could be evaluated against frozen properties;
- local task success could be separated from conservation;
- authorized semantic change could be distinguished from degradation;
- deliberately unresolved state could be evaluated;
- agent replacement could be executed without conversational transfer;
- project-state trajectories could be preserved for audit;
- the evaluation categories were sufficiently usable.
Methodological outcome:
Observed limitations:
Required protocol revisions:
Interpretation Boundary
Do not convert Pilot 001 observations into claims that:
- long-horizon AI generally degrades project state;
- a particular representation is superior;
- agent replacement causes degradation;
- Operational Project Alignment has been validated;
- Horizonte has been validated.
Pilot 001 is a methodological pilot.
Its primary result is whether the proposed experimental procedure can be executed and evaluated coherently.
Record Status
Execution: NOT STARTED
Evaluation: NOT STARTED
Pilot conclusion: NONE